Skip to content
Igor Sabodakha

Finance professional · Wiesbaden, Germany

Igor Sabodakha

Audit, transaction advisory, valuation and financial modelling — more than 15 years of international experience, seven of them at Grant Thornton.

This site publishes an open project-finance model of a German onshore wind farm. Every input has a public source or a documented assumption, every formula is documented, and the whole calculation runs in your browser.

Featured model

Fictional wind farm “Musterhöhe” · 5 × 6.3 MW · Hesse, Germany · base case at the tender price of August 2026

Equity IRR
3.09%
Project IRR after tax
3.67%
LCOE (real)
7.25 ct/kWh
Minimum DSCR
1.44x

What the base case shows

At the average award of the August 2026 tender, 4.79 ct/kWh, a site of average Hessian quality earns 3.1% a year on equity — well below a typical 8% cost of equity. The model’s lender sizes the loan on the guaranteed EEG floor — a conservative view — so debt covers only 35% of the investment. An equity return of 8% would need an award of about 7.41 ct/kWh — above the 2026 ceiling of 7.25 ct/kWh.

What the model covers

Also built by me: Storywell

Illustrated stories and audiobooks for children in eight languages. I designed, built and published the app from scratch.

App Store →Google Play →dartim-media.com →

Contact

igor.sabodakha@gmail.com